NOTE
Recommended periodicity: each 50 000 km of run or 24 months.
|
Establish the car on the lift in horizontal situation.
|
Fig. 2.27. An arrangement jellied (1) and drain (2) jams of a case of reverse main gear on all-wheel drive cars
|
Establish capacity for collecting oil under a drain stopper in reverse main gear. Turn out a drain stopper 2 (see
fig. 2.27
). After plum of oil establish a stopper into place.
Turn out a jellied stopper 1 (see
fig. 2.27
) from a case of reverse main gear.
Fill in oil through an opening to its bottom edge.
Wrap a jellied stopper.
Make a control trip and check absence of leaks through carving jams.