RAV4 PAB4-Toyota Toyota
1. Car operation
2. Maintenance
3. Engines
   Engine 3S-FE repair without its removal from the car
      General information
      Specifications
      Installation of the piston of the first cylinder in the top dead point (VMT)
      Cover of a head of the block of cylinders
      Inlet collector
      Final collector
      Gear belt and pulleys of a gear belt
      Forward sealing ring of a cranked shaft
      Sealing ring of a camshaft
      Camshafts and pushers of valves
      Head of the block of cylinders
      Oil pallet
      Oil pump
      Drive flywheel / plate
      Back sealing ring of a cranked shaft
      Support of the power unit
   Engine 1AZ-FE repair without its removal from the car
   Diagnostics and preparation of the engine for major maintenance
4. Cooling and conditioning systems
5. Fuel system and system of production of the fulfilled gases
6. Ignition system
7. The monitoring system and decrease in toxicity of the fulfilled gases
8. Coupling
9. Transmission
10. Driveshaft and shaft of a drive of driving wheels
11. Brake system
12. Suspension bracket
13. Steering and running gear
14. Body
15. Electric equipment
Electric equipment schemes






Toyota RAV4>> Engines>> Engine 3S-FE repair without its removal from the car>> Installation of the piston of the first cylinder in the top dead point (VMT)
The top dead point (VMT) is the highest point through which passes the piston at operation of the engine. Each piston reaches VMT in compression and release steps, but the term VMT usually belongs to the piston of the first cylinder in a compression step. The label on a pulley of a quencher of the fluctuations fixed on cranked shaft, also belongs to installation of the piston of the first cylinder in VMT in a compression step.
Installation of the piston of the first cylinder in VMT in a compression step – an essential part of process on replacement of pulleys and a gear belt, and also on adjustment of a gap of valves.
For piston installation in VMT it is necessary to turn a cranked shaft clockwise if to take a detached view of the engine of a gear belt. Turn a cranked shaft a key for the central bolt of fastening of a pulley to a cranked shaft.

       PREVENTION
Before installation of the piston of the first cylinder in VMT, switch off ignition and establish the gear shifting lever in neutral situation.

Installation of the piston of the first cylinder in VMT make in the following order:
– disconnect ignition system, having disconnected the electric socket from the ignition block;
– turn out spark plugs and establish a tip компрессометра in an opening for a spark plug of the first cylinder;

Fig. 3.1. Label combination on a quencher of fluctuations with a sign VMT on a forward cover


– turn a cranked shaft clockwise and at approach of the piston of the first cylinder to VMT, компрессометр will start to show increase in pressure in the cylinder. Continue to turn a cranked shaft before label combination on a quencher of fluctuations with a sign VMT on a forward cover (fig. 3.1) .
After installation of the piston of the first cylinder in VMT in a compression step, turning a cranked shaft on 180 °, it is possible to establish other pistons in VMT in sequence corresponding to an operating procedure of cylinders.